Recent Projects

Recent Building Projects by Burton Exteriors in Ringwood

Refurbishment of Downstairs Bathroom into Shower Room

Posted on Jun 8, 2017 in Recent Projects

Refurbishment of Downstairs Bathroom into Shower Room

    We removed the existing bath and replaced with large shower tray and shower screen. The floor was replaced with new light grey tiles.      ...

Read More

New Kitchen Breakfast Room

Posted on Jun 8, 2017 in Recent Projects

New Kitchen Breakfast Room

    We removed a partition wall to create a kitchen/breakfast room and refurbished both.      ...

Read More

Refurbishment of Bathroom into Disabled Shower Room

Posted on Jun 8, 2017 in Recent Projects

Refurbishment of Bathroom into Disabled Shower Room

    We removed the existing bathroom suite and replaced with a new more accessible shower suite. We fitted a fixed grab rail and a drop down safety rail and a folding wooden shower seat. The shower head was fitted to an adjustable riser for ease of use....

Read More

Replacement Staircase

Posted on Jun 8, 2017 in Recent Projects

Replacement Staircase

    We removed the existing staircase and refitted new with turning staircase at the bottom for easy access. We also supplied and fitted handrails for easy mounting.    ...

Read More

Wetroom

Posted on Mar 9, 2017 in Recent Projects

Wetroom

We renovated the bathroom of a 100 year old house in Boscombe and because of the family children being in their early 20s we decided to make a wetroom. We completed a full renovation including all the old fashioned plumbing and created new drains outside. The paint we used was Dulux Diamond Matt emulsion which is completely washable. We tiled the walls only in the wet areas and the whole...

Read More

Office Refurbishment

Posted on Mar 2, 2017 in Recent Projects

Office Refurbishment

Burton Exteriors renovated their office and part of their utility room. In the office they re-sited the computers’ storage cupboards and worktops. All ManU pictures were put into frames to suit the walls of the office. The carpets and door mats were replaced with ones that would not hold the dirt of the builders walking in. In the utility room the shower and linen cupboard were removed. In this place was re-built a workmen’s cloakroom with shoe racks below. The linen cupboard was re-built with wider shelves and shoe racks below. The floor was re-tiled in grey ceramic tiles. Above these two cupboards was inserted a box which had previously been a wine box. They added a mirror to the rear inside and a red shelf to the bottom and a strip of LED lights. The effect is beautiful. Please see...

Read More

Outside store rebuild

Posted on Dec 1, 2016 in Recent Projects

Outside store rebuild

    We demolished Stephen’s old run down shed and rebuilt him this beautiful store. One side will be used as a store, the other side is for storing wood for his wood burner. He is delighted with the result.  ...

Read More

Featured Stone Chimney Clean

Posted on Apr 21, 2016 in Recent Projects

Featured Stone Chimney Clean

    A retired couple asked us to clean their featured stone chimney and the results are astonishing.       From this….. ….to...

Read More

First floor refurbishment for couple in St Leonard’s

Posted on Mar 24, 2016 in Recent Projects

First floor refurbishment for couple in St Leonard’s

    We revamped the top floor of their house, creating a wet room with TV and underfloor heating. The grout to the tiles is resin glitter. The dressing room has a new discreet LED lighting. We fitted the bedroom with new lighting, bedhead and curtains.  ...

Read More

House Extension to accommodate lounge, bedroom and bathroom

Posted on Mar 3, 2016 in Recent Projects

House Extension to accommodate lounge, bedroom and bathroom

    Mr & Mrs Rowan asked us to build an extension to their home to accommodate  the lounge, bedroom and bathroom. This we did and kept the parameters of their existing building to comply with building control and planning.  ...

Read More